Endless Brick Project Update: You Know You Want It!

It’s been almost 2 whole weeks! And I did a bunch of insufferable culture/politics/education posts. So we all need a break:

We we last left the endless brick project, I’d just run into a nasty root: (1)

Got that sucker out:

Next steps included putting in part of the forms for the footings under the planter walls, so that I could get the depth correct on the *other* little footings that go under the places where the brick path ends without the support of the planter or the curb. What I mean is, the brick walk is just bricks on sand and a little gravel with a little bit of mortar between them. Where the walk transitions directly to dirt, such as where it ends at the power pole and in front of the water meter, the bricks will likely soon work themselves loose just by people walking on them. So I’m putting in a little 3.5″ deep, 8″ wide strips of concrete with a little rebar in it, so I can mortar those transitional bricks down so they don’t readily come lose.

That make any sense? Here’s what it looks like in front of the water meter:

For most of its length, the brick walk butts up against the curb on one side and the planter on the other, helping keep the bricks in place. Here, the bricks would end at what will be loose dirt – people stepping on them would quickly work them loose. Thus, a bit of concrete to firm it up and on which to mortar the bricks.

It’s a little tricky, since the footers under the walk are at a lower level than the footers under the planter walls. I need to have the walk footers in, and maybe even the bricks mortared on to them, before pouring the concrete for the planter. At least, it seems like I should at the moment; I can imagine some workarounds.

Here’s is where it sits as of this morning:

Looking south from the finished portion. Brick walk will be on the right to within 2′ of the pole; planter with wrought iron style fence to the left.
Looking north. The 2 2x4s are set to the correct height and position, so that I can gauge depth and position on the curved bit around the pole that ends the walk and that I’ve yet to pour. Eventually, more forms will be added, leaving a 12″ wide strip of open dirt down the middle where the planter proper will sit, with walls on either side and towers to support the wrought iron style fence at either end – just like the existing planter/wall.
This little curved trench will have a 3-4″ deep slab poured into it, upon which will be affixed brick; at the top of the curve, in the center, a bit of the planter walls will sit atop the curve; bottom right, the planned south wall will begin where the curve ends.

Today or most likely tomorrow I will put in some rebar and pour the curve section. Youngest son will be back from a week of Boy Scout camping on Sunday – I’ll wait for his help and rent a mixer to do the planter footings, so next week, maybe?

Then I’ll be all set to while away many hours on my hands and knees laying bricks. Hope to be more or less done with it by the end of summer. This will satisfy my bricklaying Jones for many years to come, I should think.

Advertisements

Author: Joseph Moore

Enough with the smarty-pants Dante quote. Just some opinionated blogger dude.

2 thoughts on “Endless Brick Project Update: You Know You Want It!”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s